PF Coil Manufacture


Superconducting Coil Jacketing Building
(completed in 2009)

Superconducting Coil Winding Building
(completed in 2009)

First length of EF - H(igh Field Side)
conductor manufactured
(March 2010)

Rig for current sharing temperature test
of sample of EF-H
(April 2010)

Trial manufacture of attachment system for EF4
(April 2010)

Jacketing of EF4 conductor and helium leak test
(July 2010)

Trial compaction rig test for
CS and EF-L(ow field side) conductors
(August 2010)

The 3 different types of
CS/EF conductors manufactured
(October 2010)

Dummy double pancake fabricated for EF4
(December 2010)

Two EF4 superconductors leaving Naka
for the coil manufacturer