Procurement Sharing

 
System
JA Contribution
EU Contribution
Magnets CS, EF, and clamps, feeders, cryolines, instrumentation, coil terminal box, cryo valve box TF and case (F+I), test facility (F), current leads (D)
Vessel All
In-vessel All
Power Supply PF Base PS, RWM PS connection and instrumentation, Rearrangement of existing supplies PF supplementary PS, TF PS, quench protection, RWM PS, Error field PS (F+I)
Thermal Shields All
Cryostat Port extensions, lid, material, vacuum pumping Shell (excl. lid), cryostat base (ES)
Cryoplant Interfaces to existing services and buildings Cold box with internal systems (F).
RH system All
Assembly All
Disassembly All
Water Cooling All
Heating Beams, including upgrading, 110 Ghz ECRF system, 2 110 GHz gyrotrons 2 110 GHz ECRF system gyrotron power supplies (CH)
Diagnostics All
SCSDAS All
Radiation safety All